Hi SCN,
With the MDG Data Import functionality, is it possible to load materials into an import change request (MAT0B) with a temporary material key (e.g. $xxxx) which on final approval gets converted an internal material number within the configured # range? We have configured the standard MDG create (MAT01) change request to do this....temporary number that on final approval get converted to a number within the configured # range.
Additional Information
I've read the documentation for the standard MDG Data Import functionality (How to... MDG-M: Use the Data Import Framework) and it mentions you can create the Materials directly in the active area or you can create then in the staging area if you select the 'Governance' checkbox and choose a relevant CR type (MAT0B is the standard). I do not see any mentioned of temporary numbers in this document.
I am using the BADI (BADI_MDG_FILECONVERTER) to convert CSV file to idocs and we are on a MDG co-deployed solution.
With this BADI I have been able to successfully create a change request which contains the Materials in the CSV file. I can load them with an internally generated material # and also with a non-internal # (see below).
MDG Material Change Requests (MAT0B - Import Material)
Generated material number from the internal number range
Material number outside the internal number range.
Restating my question...it possible to load materials into the standard data import change request (MAT0B) with a temporary number that on final approval will be converted to an internal number when saving in ECC. (By the way, we are not replicating the IDOCs but saving directly in ECC)
I do not want to load materials to the import change request with a generated internal number because if the change request gets rejected then all the generated material numbers become void and cannot be used.
Regards,
Peter Melouney