Hi All,
We have a scenario where we need to distribute the Material from MDG HUB system to different ECC system and one of those is legacy ECC system where the number range for material is different from the one which will be created in MDG and now onward whenever the Material will be created that will also needs to be distributed in that legacy ECC system as well.
So there will be difference in number range of MDG HUB and one of the ECC system.
So at the time of sending the material from MDG to ECC how can we deal with Number range issue? How can we get the new Material number for legacy ECC where the material needs to be distributed.
We will be using IDOC MATMAS for sending the Material.
Thanks
Sachin G