Hi Experts!
I have seen this document that explains how to configure the MDGM Worflow with parallel workflow tasks.
Set up Parallel Workflow Tasks with BRF+ (BADI USMD_SSW_PARA_RESULT_HANDLER)
But I have to know at design time the number of possible parallel tasks. Is it possible to determine this number of parallel tasks at execution time? We need it to create a parallel task for each sales channel or plant added to the material.
Thanks in advance!
Best regards,
Roberto