Hi
Can it possible to reduce steps for Finalize Processing ( Step type 7) required for workitem for PO Data and CC data and directly it should go with Approval for PO Data and CC Data\ for WS53100044 with edit button in IMG node?
CR now follows below path
- After CR submission it goves for Approval with CR status: To be considered and approved
- After Approval it creates two workitems one for PO data and other with CC data and it goes for Finalize Processing with CR status: Dependant Data to be processed/Approved
- After Finalize Processing it goves to Approval for PO Data and CC Data.
- After both workitems approvals it creates Vendor in MDG and replicate into ECC.
Now I want as per below
- After CR submission it should create two workitems one for PO data and other with CC data and it goes for Approval with Edit option with CR status: Dependant Data to be processed/Approved
- After both workitems approvals it creates Vendor in MDG and replicate into ECC.
Is this possible? If yes can we control in IMG only.